Getting ready for the Pre-Slope

floor2.JPG

The floor of a ceramic tile shower is an impressively complex system, with a slew of layers in it.  After putting in the plywood floor, the next step is a tar-paper backer, and then a metal lathe to add strength to the mortar that makes up the pre-slope.  I’ve also stacked three 2×4’s at the entrance to make up the shower dam, which will prevent water from flowing into the rest of the bathroom. 

Bookmark the permalink.

Deprecated: ltrim(): Passing null to parameter #1 ($string) of type string is deprecated in /home/jaguar/public_html/wp-includes/wp-db.php on line 3031

One Response to Getting ready for the Pre-Slope

  1. DGGerman says:

    What are “filler” blocks between studs?